Compliance news / Workplace safety

Workplace safety

OSHA and MSHA rules, enforcement and guidance, plus construction, electrical, fire and heat safety.

67 items · RSS for this section

Workplace safetyTransportation and hazmatMaritime and aviation ground supportEnvironmental and wasteFood safetyHealthcare privacy and data securityWorkplace conduct and state law
TYPEAllFinal ruleProposed ruleNoticeEnforcementRecallPress releaseNews
Nov 9, 2026Final ruleOfficial source

Final rule: National Emission Standards for Hazardous Air Pollutants: Polyvinyl Chloride and Copolymer Production Reconsideration; New Major Source Process Wastewater Standards

The U.S. Environmental Protection Agency (EPA) is finalizing amendments to the national emission standards for hazardous air pollutants (NESHAP) for the Polyvinyl Chloride (PVC) and Copolymer Production source category ("PVC NESHAP") under Clean Air Act (CAA) section 112. For new major sources, the EPA is finalizing the removal of the total non-vinyl chloride organic hazardous air pollutant (HAP) process wastewater emission limit and the associated testing, monitoring, recordkeeping, and reporting requirements. The EPA is also finalizing that the new major source vinyl chloride emission limit

Effective Nov 9, 2026

Source: Federal RegisterEnvironmental and wasteWorkplace safety
Nov 3, 2026Final ruleOfficial source

Final rule: National Emission Standards for Hazardous Air Pollutants: Lime Manufacturing Plants Technology Review; Correction

The Environmental Protection Agency (EPA) is making a correction to the National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants (Lime Manufacturing NESHAP) technology review final rule that appeared in the Federal Register on July 16, 2024. Following publication of this final rule, the EPA discovered an inadvertent error in the regulatory text and is correcting the error in this action.

Effective Nov 3, 2026

Source: Federal RegisterEnvironmental and wasteWorkplace safety
Oct 13, 2026Final ruleOfficial source

Final rule: Clean Water Act Hazardous Substance Facility Response Plans: Compliance Date Delay and Changes To Reflect Administration Policy

The Environmental Protection Agency (EPA) is finalizing an extension to the compliance date for Facility Response Plans (FRPs) required by the Clean Water Act (CWA) addressing potential worst-case discharges of CWA hazardous substances. These requirements apply to onshore non-transportation-related facilities that could reasonably be expected to cause substantial harm to the environment from a CWA hazardous substance worst-case discharge to navigable waters, adjoining shorelines, or the exclusive economic zone. This action is also finalizing language modifications to remove references to clima

Effective Dec 14, 2026

Source: Federal RegisterEnvironmental and wasteWorkplace safety
Sep 28, 2026Final ruleOfficial source

Final rule: Hazardous Materials: Incorporation of ASME Code Section XII and the National Board Inspection Code

PHMSA is amending the Hazardous Materials Regulations (HMR) to incorporate by reference and authorize the use of the 2015 edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XII--Rules for Construction and Continued Service of Transport Tanks for the construction and continued service of certain specification cargo tank motor vehicles (CTMVs), cryogenic portable tanks, and multi-unit tank car tanks. PHMSA is also amending the HMR to incorporate by reference and authorize the use of the 2015 edition of the National Board of Boiler and Pressure

Effective Oct 28, 2026

Source: Federal RegisterTransportation and hazmatWorkplace safety